North Central
North Central Project
Partnering with Layton Construction, we installed 30,000 square feet of Wausau Tile pavers across multiple levels of this 29-story multifamily tower. Nearly all pavers—12″x24″x2″ and 18″x36″x3″—were pedestal-set, with Fibergrate supports under cuts near pools on the 8th and 28th floors. The architect’s gradient pattern in three colors tied the design together across ground level, upper terraces, and rooftop amenities. Logistics were challenging, with limited crane time and long waits for traditional elevators, but the project was completed on time, delivering elevated outdoor spaces that match the building’s sleek design.